Extension |
Up |
More albums: |
![]() Set 1 - 25th September - 16th November 65 images |
![]() Set 2 - 17th November - 14th January 60 images |
![]() Set 3 - 15th January - 3rd March 66 images |
![]() Set 4 - 4th March - 3rd May 56 images |
![]() Set 5 - 4th May - 18th June 62 images |
![]() 310 22nd June: there used to be a window here |
![]() 311 Porch floor |
![]() 312 26th June: Wood on the stairs |
![]() 313 |
![]() 314 28th June: Wooden stairs complete |
![]() 315 1st July: Wooden floor down in the hallway |
![]() 316 -- fitting the floor must have been challenging (that piano has an iron frame and weighs approximately half a ton) |
![]() 317 Panelling (at least virtually) on the downstairs loo door |
![]() 318 6th July: Server room in all its glory |
![]() 319 |
![]() 320 |
![]() 321 Going blind in the library |
![]() 322 The Very Big Mirror delivered |
![]() 323 Painting the porch |
![]() 324 The naked |
![]() 325 Wine rack in progress |
![]() 326 11th July: the library with rather less Stuff in it |
![]() 327 12th July: Radiators -- for the hallway |
![]() 328 Top hallway |
![]() 329 In the dining room |
![]() 330 Splashback, still coated |
![]() 331 |
![]() 332 13th July: Splashback in place |
![]() 333 Steel for the garage |
![]() 334 14th July: Fitting the steel |
![]() 335 |