Extension : Set 5 - 4th May - 18th June |
Up |
![]() 248 4th May: the wooden floor going down in the dining room |
![]() 249 The nailgun |
![]() 250 |
![]() 251 5th May: wooden floor complete |
![]() 252 The new light fitting in the dining room |
![]() 253 Syl gets that sinking feeling |
![]() 254 7th May: Big Cooker |
![]() 255 look, all of the built-in stuff FITS (I measured it, so this is more surprising than you might expect) |
![]() 256 9th May: dining room all but done |
![]() 257 |
![]() 258 13th May: moving out of the bedroom |
![]() 259 Hideous decor about to be terminated with extreme |
![]() 260 Removing the carpet |
![]() 261 The bay window revealed (it could be worse -- next door have birds nesting in theirs) |
![]() 262 Yes, it really was this hideous previously |
![]() 263 ... not to mention damp at some points |
![]() 264 This is an ex-bedroom |
![]() 265 14th May: knocking through into the en-suite |
![]() 266 Gaffer tape holds the universe together |
![]() 267 16th May: Plaster |
![]() 268 18th May: progress on the en-suite |
![]() 269 A more sturdy version of the bay window |
![]() 270 23rd May: bathroom unit finally makes it into the en-suite |
![]() 271 25th May: it is easy being green |
![]() 272 29th May: wood floor down in the bedroom |
![]() 273 |
![]() 274 2nd June: new granite hearth in place |
![]() 275 Granite worktops... |
![]() 276 ... being fitted |
![]() 277 Lots and lots of worktop space! |
![]() 278 |
![]() 279 (next to the cooker) |
![]() 280 |
![]() 281 6th June: wooden floor in the new hallway |
![]() 282 And in the server room |
![]() 283 8th June: yet more architraves |
![]() 284 The driveway makes it beyond the "concrete" stage at last |
![]() 285 Drawing a (drain) line in the sand |
![]() 286 Careful... |
![]() 287 ... placement ... |
![]() 288 ... is vital ... |
![]() 289 |
![]() 290 Nearly done! |
![]() 291 |
![]() 292 13th June: the server room |
![]() 293 This will shortly be a stationery cupboard "what, do your others move, then?" "oh, shut up" |
![]() 294 The en-suite is nearly complete |
![]() 295 |
![]() 296 |
![]() 297 Doors are being fitted |
![]() 298 And the fridge is now in use! |
![]() 299 17th June: doors have been varnished |
![]() 300 Graham has figured out how to work the milk steamer; mmm, mocha latte |
![]() 301 The kitchen now has a stool (shortly to be recovered into something more matching), and a leg under the worktop |
![]() 302 |
![]() 303 |
![]() 304 18th June: fitting new boards to the banisters |
![]() 305 |
![]() 306 |
![]() 307 Cooker now in place -- |
![]() 308 -- likewise dishwasher -- |
![]() 309 -- and the utility room is almost ready, too... |